This is the authors' abstract. We don't add key points for this paper.
This study investigates the design and optimisation of a hybrid plant comprising an array of 30 MWac PV-CSP modules. Each module integrates a PV system, a power tower CSP with thermal energy storage, and a gas-fired generator for backup power. This configuration aims to leverage the benefits of both PV and CSP technologies while addressing the challenges associated with large-scale CSP systems, such as high upfront costs and lengthy construction periods. A Python-based application was developed to optimise and simulate a modular PV-CSP hybrid plant. This application integrates existing software with custom computational and financial models to generate performance and economic metrics. These metrics were used to compare a single 120 MWac plant with a modular plant comprising 4 x 30 MWac modules that are constructed sequentially. The large-scale plant demonstrates better economic performance across all investigated metrics. The modular layout enables earlier revenue generation; however, it has a higher total installation cost than the large-scale plant. These findings highlight the possible economic advantages of constructing single large-scale systems rather than integrating several small-scale systems.
Answers are grounded in this paper and cite their sources.
No takes yet. Share an insight, caveat, or question.
Gardiner et al. (2025) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: