To evaluate the fire safety performance of the joint region in prefabricated buildings, specifically when the grout in the slurry layer is under an unconstrained state. Total 54 pull-out specimens were designed to investigate the effects of elevated temperatures (20 °C, 200 °C, 300 °C, 400 °C, 500 °C, and 600 °C) and steel bar positions (center, mid-side, and corner) on the bond behavior between the grout and steel rebars. The failure modes, bond strength, ultimate displacement, and load–slip curves of the specimens were recorded. The peak load of the specimens with the temperature increasing first rose and then declined, exhibiting a trend consistent with the variation in compressive strength of the grout with temperature. At 600 °C, the ultimate loads of the center, mid-side, and corner specimens decreased by 53.46%, 52.53%, and 51.28%, respectively, compared with those at ambient temperature. At ambient temperature, the bond strength of the mid-side specimen was 11.24% lower than that of the central specimen, but 19.98% higher than that of the corner specimen. At 500 °C, the bond strength of the mid-side and corner specimens decreased by 15.76% and 39.26%, respectively, compared with that of the center specimen. The failure mode changed from steel-rebar fracture to pull-out failure due to the high temperature exposure and the steel rebar position. Finally, based on the post-heating strength test results of grout specimens, a bond strength calculation formula and a bond–slip constitutive model, considering both steel rebar position and temperature, were developed, achieving a correlation coefficient (R2) close to 1.0.
Peng et al. (Tue,) studied this question.