January 24, 2026Geomechanics and Tunnelling0 citations

Building over a highly sensitive urban subway station ‐ Achieving the near‐impossible through collaboration

View Full Paper
GAGeorg AtzlJKJürgen KrakerMBMarkus Brandtner

Key Points

  • The aim is to develop a construction method that minimizes deformation and uplift of underground tunnels during excavation.
  • Demolition of existing buildings to prepare site for new construction.
  • Deep excavation in Miocene clay silt while considering groundwater effects.
  • Structural engineering design based on geotechnical investigations and condition assessments.
  • Implementation of a monitoring system to observe structural deformations during construction.
  • The excavation technique minimized uplift and deformation of the U‐Bahn tunnels and tracks.
  • Forecasted system behavior closely matched actual observations during construction.
  • Manageable leaks in tunnels were successfully sealed after construction completion.

Abstract

Abstract The previous buildings around the existing underground U‐Bahn U3 Westbahnhof Station in Vienna, were demolished to make way for the new IKEA building. This was constructed with a deep excavation pit in the Miocene clay silt under the effect of groundwater. The deepest part of the excavation was only about four metres above the tunnel roofs of the U‐Bahn tubes. The main technical challenge was to develop a construction method that would cause as little uplift and deformation of the underground tunnels, including tracks and switches (especially curvature), as possible. A structural engineering design was developed based on comprehensive geotechnical investigations, existing documentation, condition assessments and mathematical forecasts. This design envisaged sectional excavation at depth with simultaneous construction of the above‐ground floors. The aim was to keep the load caused by the excavation directly above the U‐Bahn tunnels as low as possible. A comprehensive monitoring system was implemented to monitor structural deformations. During construction, the actual system behaviour largely corresponded to the forecasts. There were isolated but manageable leaks in the underground tunnels, which were successfully sealed after completion of the IKEA shell construction.

Ask AI
Helpful
Bookmark
Share
View Full Paper

Cite This Study

Atzl et al. (2026) studied this question.

synapsesocial.com/papers/69746050bb9d90c67120a29fhttps://doi.org/10.1002/geot.70057
Ask AI
Helpful
Bookmark
Share
View Full Paper