Emergency DPR system improved water quality in Wichita Falls, suggesting feasibility for future reuse efforts.
From 2011 to 2015, Wichita Falls, TX, faced a severe drought that dropped combined lake levels below 23%, prompting the city to implement an emergency direct potable reuse (DPR) system. The city proposed a plan to the Texas Commission on Environmental Quality (TCEQ) in 2012 to treat wastewater through existing advanced and conventional treatment plants. After constructing the necessary interconnections, two full-scale verification tests were conducted in 2014. Following TCEQ approval, the City operated the DPR treatment facility from 9 July 2014 through 21 July 2015. During its operation, more than 2 billion gallons (7.6 million cubic meters) of highly treated wastewater effluent were turned into potable water. After a historic rainfall event in May 2015, the system was decommissioned, having had no major incidents during its 377 days of full-scale operation. Wichita Falls' experience demonstrates the feasibility of large-scale potable reuse under emergency conditions and provides valuable operational and regulatory insights for utilities considering potable reuse implementation.
No takes yet. Share an insight, caveat, or question.
Benjamin et al. (2026) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: