Approval from New Mexico SHPO for 18 infrastructure projects at Cannon AFB, indicating readiness for beddown operations.
Letter from New Mexico SHPO expressing approval for 18 proposed projects (construct fence at kennel complex; add runway guard lights; install water transfer station at effluent basin; install treated waste water irrigation system; build awning along building 307; construct parking for 73rd AMU; install chain link fence at main gate; install oil water separator; construct 4th gas line; construct water distribution system; construct natural gas system; remove septic tank and connect sewer lines; install valves and valve pit; construct road from gate to fire hydrant; repair/bury overhead electric at golf course and unity park; independent site unit storage yard) ahead of beddown operations on Cannon AFB.
No takes yet. Share an insight, caveat, or question.
Parker Miraldi (2013) studied this question.
Synapse has enriched 8 closely related papers on similar clinical questions. Consider them for comparative context: