Answers are grounded in this paper and cite their sources.
Dynamic maintenance strategy enhances load recovery in distribution networks, suggesting improved resilience management.
In the context of increasing extreme weather events and human-induced disasters, enhancing the resilience of distribution networks has become a critical challenge for power systems. Traditional post-disaster maintenance strategies often rely on static decision-making models, which fail to account for the dynamic evolution of network topology and the coupling effects of multi-type faults during the restoration process. To address these limitations, this paper proposes a dynamic maintenance restoration strategy with network reconfiguration for the distribution network. A novel multi-fault set, denoted as ( L O , N O , L C , N C ) , has been developed to address physical damage and malfunctions in protection systems comprehensively. This set is integrated into a multi-stage optimization framework that synchronizes maintenance scheduling with network reconfiguration. The framework utilizes a mixed-integer linear programming formulation aimed at maximizing the recovery efficiency of system load. In the IEEE 33-bus test system, the proposed method outperforms traditional and heuristic methods in various fault scenarios. It improves the RES by 3.06% to 22.42% over static strategies and by 0.07% to 12.42% over heuristic methods. Additionally, it reduces maintenance path lengths by 20.04% to 34.77% and enhances weighted load restoration by 4.85% to 51.86%. • A comprehensive multi-fault set model ( L O , N O , L C , N C ) is proposed, effectively capturing the interactions between physical damage and protection system failures. • A dynamic multi-stage optimization framework is developed, co-optimizing maintenance crew scheduling and network reconfiguration in a rolling horizon. • An efficient Mixed-Integer Linear Programming model with Receding Horizon Optimization is formulated, providing scalable solutions for sequential restoration decisions. • Simulations on the IEEE 33-bus system show the method improves load recovery efficiency by 3.06%–22.42%, reduces maintenance path length by 20.04%–34.77%, and enhances weighted load restoration by 4.85%–51.86%compared to static strategies.
No takes yet. Share an insight, caveat, or question.
Zhang et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: