Evaluation of forecasting methodologies predicts equipment adoption rates for Tanzania's power sector, highlighting data quality issues.
The expansion and modernisation of power-distribution infrastructure is critical for economic development. In Tanzania, strategic planning for this expansion requires robust, data-driven forecasts of equipment adoption, yet existing methodologies often lack rigorous evaluation and tailored forecasting models. This study aims to methodologically evaluate current power-distribution equipment systems and to develop a bespoke time-series forecasting model for predicting the adoption rates of key equipment, such as transformers and switchgear, to inform infrastructure investment. A comparative evaluation of forecasting methodologies was conducted. A seasonal autoregressive integrated moving average (SARIMA) model, specified as SARIMA(1,1,1)(1,1,1)₁₂, was selected and calibrated using national historical procurement and deployment data. Model diagnostics included analysis of robust standard errors and the Ljung-Box test for residual autocorrelation. The SARIMA model provided a statistically adequate fit, with forecast adoption rates for key equipment indicating a mean annual increase of 8.7% (95% CI: 7.2% to 10.3%) over the forecast horizon. The methodological evaluation identified systemic data-lag issues in current inventory practices that bias simpler projection models. The developed forecasting model offers a more reliable tool for predicting equipment needs than previously used methods. The findings underscore the necessity of addressing foundational data-quality issues to improve long-term infrastructure planning. It is recommended that the national utility adopts the presented forecasting framework for its capital planning cycles. Furthermore, implementing real-time data-capture systems for equipment deployment is essential to enhance forecast accuracy. infrastructure planning, time-series analysis, SARIMA modelling, electrical grid, asset management, forecasting This paper presents a novel, empirically validated forecasting model tailored to the Tanzanian power sector's data constraints, providing a critical tool for evidence-based infrastructure investment.
No takes yet. Share an insight, caveat, or question.
Mwinyi et al. (2011) studied this question.
Synapse has enriched 8 closely related papers on similar clinical questions. Consider them for comparative context: