PulseExploreJournal ClubDebatesTrendingResearchersJournals
Instagram
HomeExploreJournal ClubTrending
Synapse
⌘+K
Synapse
March 13, 20260 citationsOpen Access

A Methodological Evaluation and Cost-Effectiveness Forecasting Model for South African Power-Distribution Equipment Systems (2000–2026)

View Full Paper
TMThandiwe van der MerweSouth African Institute for Medical Research

Key Points

  • The study aims to develop and evaluate a forecasting model for assessing cost-effectiveness in power-distribution equipment.
  • Conducted a case study using historical operational and cost data from a major utility.
  • Utilized a vector autoregression (VAR) model for analysis.
  • Assessed model robustness with heteroskedasticity-consistent standard errors.
  • Confirmed the model's utility for forecasting total ownership costs.
  • Projected an 18–25% increase in cost per unit of reliability under current investment trends.
  • Identified transformer populations as the primary cost-driver.

Abstract

"background": "The long-term financial sustainability of power-distribution infrastructure is a critical engineering challenge, particularly in contexts of constrained capital expenditure and ageing assets. Existing asset management models often lack integrated, forward-looking cost-effectiveness analyses tailored to specific national grid conditions. ", "purpose and objectives": "This case study develops and methodologically evaluates a novel time-series forecasting model to measure the cost-effectiveness of power-distribution equipment systems. The objective is to provide a robust, data-driven tool for long-term capital planning and asset replacement strategy. ", "methodology": "A case study methodology was employed, utilising historical operational and cost data from a major utility. The core analytical engine is a vector autoregression (VAR) model, specified as yt = A1 y{t-1 + \ + Ap yt-p + \, where yₜ is a vector of cost and performance metrics. Model robustness was assessed using heteroskedasticity-consistent standard errors. ", "findings": "The methodological evaluation confirms the model's utility for forecasting total cost of ownership. A key forecast indicates that, under current investment trends, the cost per unit of reliability is projected to increase by approximately 18–25% over the forecast horizon, with a 95% prediction interval of 16. 2%, 27. 1%. The model identifies transformer populations as the most critical cost-driver. ", "conclusion": "The developed forecasting model provides a technically sound and methodologically rigorous framework for evaluating the cost-effectiveness of distribution assets. It successfully integrates historical performance data into a predictive financial planning tool. ", "recommendations": "Utilities should adopt similar integrated forecasting models for strategic asset management. Future work should incorporate real-time sensor data to transition from time-based to condition-based forecasting, enhancing predictive accuracy. ", "key words": "asset management, cost forecasting, distribution infrastructure, vector autoregression, engineering economics", "contribution statement": "This paper presents a novel integrated VAR modelling framework that uniquely combines technical

Ask AI
Helpful
Bookmark
Share
View Full Paper

Cite This Study

Thandiwe van der Merwe (2001) studied this question.

synapsesocial.com/papers/69b3ac9002a1e69014cce5dahttps://doi.org/10.5281/zenodo.18968692
Ask AI
Helpful
Bookmark
Share
View Full Paper