Methodological evaluation demonstrates a novel forecasting model for municipal infrastructure cost-effectiveness, suggesting improved asset management strategies.
{ "background": "Municipal infrastructure asset systems in South Africa face significant challenges in long-term financial planning and sustainability. Existing models often lack the temporal granularity and methodological rigour to forecast cost-effectiveness accurately, hindering strategic asset management.", "purpose and objectives": "This data descriptor presents a methodological evaluation of a novel time-series forecasting model designed to measure the cost-effectiveness of municipal infrastructure asset systems. The objective is to detail the model's architecture, data requirements, and validation protocol.", "methodology": "The methodology employs a seasonal autoregressive integrated moving average with exogenous variables (SARIMAX) model, specified as \φ(B)\Φ(Bˢ)\∇ᵈ yt = \θ(B)\Θ(Bˢ)\ + \β Xt, where Xₜ represents a vector of exogenous economic and demographic variables. Model parameters were estimated using maximum likelihood, with robust standard errors to account for heteroskedasticity.", "findings": "The methodological evaluation indicates that the integrated model provides a robust framework for forecasting, with out-of-sample validation showing a mean absolute percentage error (MAPE) of less than 8% for key cost indices. A principal finding is the model's sensitivity to exogenous economic variables, which account for approximately 60% of the forecast variance in long-term maintenance expenditure.", "conclusion": "The proposed time-series model constitutes a technically sound methodological advance for forecasting infrastructure cost-effectiveness, offering a structured and replicable approach for municipal engineers and planners.", "recommendations": "It is recommended that municipalities adopt this forecasting methodology within their asset management plans and that future work focuses on integrating spatially disaggregated data to enhance localised predictions.", "key words": "asset management, infrastructure economics, municipal engineering, SARIMAX, forecasting, cost-benefit analysis", "contribution statement": "This paper provides the first integrated SARIMAX forecasting model specifically configured for the South African municipal infrastructure context, detailing its complete methodological framework and validation data."
No takes yet. Share an insight, caveat, or question.
Thandiwe van der Merwe (2010) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: