Quality risk management identifies and evaluates risks in offshore wind setup, implying improved construction outcomes.
With the rapid development of the offshore wind power industry, the construction process of offshore wind power jackets faces numerous quality risks, particularly in welding, coating, and assembly operations. This paper aims to investigate the identification, assessment, and management of quality risks during the construction of offshore wind turbine foundation structures. By establishing a multidimensional quality risk assessment framework, key risk factors affecting quality were identified through expert interviews and brainstorming sessions. Comprehensive evaluations of these risk factors were conducted using the Entropy Weight Method (EWM), the Technique for Order Preference by Similarity to Ideal Solution (TOPSIS), and Grey Relational Analysis (GRA). The findings indicate that welding and coating processes pose the highest risks during construction. Based on these assessments, corresponding risk mitigation measures are proposed, including process optimization, automation enhancement, environmental control, and management system refinement. This study provides theoretical foundations and practical guidance for improving construction quality and reducing costs in offshore wind turbine foundation manufacturing. It advances quality risk management by introducing an integrated evaluation model that addresses the limitations of single-method approaches in complex construction scenarios.
No takes yet. Share an insight, caveat, or question.
Wang et al. (2026) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: