Multi-stage framework optimizes compressor control, improving energy efficiency in industrial settings, suggesting predictive methods are superior.
This paper presents a multi-stage framework for energy-optimal industrial compressor control in highly volatile demand conditions and analyzes the impact of forecast quality on closed loop performance. For compressor activation scheduling, a receding finite horizon dynamic programming formulation is used. The approach is coupled with an exhaustive load-sharing optimization and noise mitigation control. Within the scope of a case study for Europe’s largest manufacturing plant in northern Germany, the beneficial application of predictive activation scheduling compared to the commonly implemented reactive activation is showcased. Depending on the demand forecast quality, the approach achieved energy savings of 3.7 to 10 % compared to a purely reactive control strategy.
No takes yet. Share an insight, caveat, or question.
Lassahn et al. (2026) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: