Answers are grounded in this paper and cite their sources.
Investigates energy-efficient scheduling in a flexible flow shop, integrating advanced energy flexibility strategies and optimization methods.
This paper addresses energy‐efficient production scheduling in a flexible flow shop by integrating advanced energy flexibility strategies. A smart manufacturing setting is considered, with energy supplied from multiple sources: grid electricity with time‐of‐use pricing, photovoltaic generation, and an energy storage system. In addition, a demand bidding mechanism allows the facility to submit curtailment capacity bids during periods of power system stress, reducing electricity load in exchange for financial incentives. Two exact optimization approaches are investigated: a mixed integer linear programming model and a hybrid method integrating constraint programming. Computational experiments are conducted on a dedicated benchmark and compared with genetic algorithm, tabu search, and ant colony optimization approaches. Results show that the hybrid method consistently delivers high‐quality solutions, achieving the best relative gap below 1% for all instance sizes, while metaheuristics remain competitive in terms of computation time with small relative gaps.
No takes yet. Share an insight, caveat, or question.
Mhanna et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: