Answers are grounded in this paper and cite their sources.
Comprehensive study demonstrates enhanced phosphorus removal in wastewater using polyferric sulfate, implying improved treatment efficiency.
In this study, the optimization strategy and underlying mechanisms of chemical deep phosphorus removal using polyferric sulfate (PFS) were systematically investigated through a combination of engineering validation and mechanistic analysis, revealing the FePO4 precipitation-dominated phosphorus removal mechanism and the influence of coexisting impurities and clarifying the key liganding role of Fe3+ by FTIR/XPS. The engineering applicability of secondary PFS dosing and PFS–polyacrylamide (PAM) codosing was validated in a full-scale wastewater treatment plant with a treatment capacity of 4 × 104 t·d–1, where a substantial enhancement in orthophosphate (Ortho-P) removal efficiency was achieved (increased by 30.6% and 28.1%, respectively). In addition, the threshold effects of PFS on the microbial activity in the AAO system were clarified under practical operating conditions. Collectively, this study offers both theoretical insights and engineering-level evidence to support the fine regulation of chemical phosphorus removal in wastewater treatment plants (WWTPs), and it exhibits substantial practical value for enhancing phosphorus removal efficiency and operational stability.
No takes yet. Share an insight, caveat, or question.
Xiang et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: