In limited–overs cricket, rain interruptions require adjustment of the target score for the chasing team. The Duckworth–Lewis–Stern (DLS) method is widely used for this purpose but does not explicitly include factors such as pitch condition, dew accumulation, or player strength. To address this limitation, we propose a Fuzzy-DLS model that includes fuzzy logic into a generalized resource function. The method allows batting quality index (BQI), bowling threat index (BTI), pitch state, and weather effects to adjust the resource curve in a continuous and interpretable way. For the 30 illustrative cases in Appendix A, the proposed formulation differs from the DLS resources by a mean absolute amount of 0. 0152, with a mean relative difference of 2. 66\% and a mean absolute par-score difference of 2. 13 runs. In the 100-match ODI sample analysed here, chasing teams won 56. 5\% of winter matches compared with 37. 0\% in non-winter matches, giving an odds ratio of 2. 21 and a chi-square p-value of 0. 081. These results support the use of fuzzy match-condition inputs transparently.
Samanta et al. (Mon,) studied this question.