Demonstrates optimal site identification for solar farms in a coastal region, indicating effective land use planning.
The large-scale deployment of photovoltaic (PV) systems increasingly faces land-use conflicts, particularly in regions with high environmental sensitivity resulting from intensive urban development. Consequently, decision-makers require transparent, spatially explicit tools to identify suitable areas for utility-scale PV installations (>100 kWp). This study addresses these challenges through the application of a Geographic Information System (GIS) to locate optimal sites for solar farms along the coastal zone of the Region of Murcia (southeastern Spain). First, the research characterizes the territorial context and systematically reviews the European, national, and regional regulatory frameworks to identify relevant legal and environmental constraints. These constraints are translated into thematic layers within the GIS environment and progressively applied to exclude unsuitable land through spatial editing and overlay analyses. The remaining feasible areas are subsequently evaluated according to their photovoltaic potential using publicly available solar resource data. The results show that nearly one quarter of the coastal territory is legally and environmentally suitable for PV deployment. Furthermore, due to the favourable geographical conditions of this Spanish region, the annual photovoltaic potential along the coastal zone reaches nearly 48,000 GWh, which would not only meet the Region of Murcia’s annual electricity demand (approximately 8000 GWh) but also supply neighbouring areas in southeastern Spain.
No takes yet. Share an insight, caveat, or question.
Sánchez-Lozano et al. (2026) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: