A project management framework improves material forecasting in disaster recovery, suggesting enhanced logistics.
When Hurricane Fiona struck Puerto Rico in September 2022, the restoration effort required more than mobilizing field resources; it also depended on precise, time‐sensitive material forecasting conducted under significant operational and logistical pressure. Critical components such as power transformers, reclosers, poles, and structural hardware had long manufacturing lead times and were available in limited on‐island quantities. Crews were deployed across challenging, geographically dispersed terrain, and the transmission and distribution network urgently needed rapid condition assessment, prioritization, and sequencing to stabilize system performance. Supporting this environment hinged on aligning material demand signals with procurement cycles and deployment logistics to keep restoration activities moving without interruption.
No takes yet. Share an insight, caveat, or question.
Joseph Spadoro (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: