A functional improvement to the linear-programming-based optimal power flow technique is reported. The new feature allows the rescheduling of the active power controls to correct voltage-magnitude-constraint violations. It preserves the reliability and speed characteristics of the traditional linear programming approach. Results demonstrating the effectiveness of the method on a small and a large power system are presented.< <ETX xmlns:mml="http://www.w3.org/1998/Math/MathML" xmlns:xlink="http://www.w3.org/1999/xlink">></ETX>
No takes yet. Share an insight, caveat, or question.
Kirschen et al. (1988) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: