This is the authors' abstract. We don't add key points for this paper.
Presently, global software development (GSD) is growing very rapidly. However, it is not an easy and straightforward process. Requirements engineering (RE) and requirements change management (RCM) both are considered as very challenging activities due to demanding rich communications. Because it is necessary to address geographical and cultural differences in GSD, this requirement makes RE and RCM challenging. This paper investigates the importance of project management in RE and RCM processes. First, the frameworks with the phenomena of specialized project management are proposed for RE and RCM. Then, a survey and blind interviews of the experts are conducted to validate the proposed frameworks. Finally, statistical tools are applied to analyze the collected data. By utilizing the analyzed data, our results show the significant impacts of both frameworks (i.e., RE and RCM) in the GSD environment.
Answers are grounded in this paper and cite their sources.
No takes yet. Share an insight, caveat, or question.
Shafiq et al. (2018) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: