PV -Battery system under FiT incentive is modelled to maximise revenue streams. Optimisation model is developed to optimise power flows in the PV-Battery system. Real residential PV and demand data is used to simulate the optimisation model. Sensitivity analysis on the impact of battery capacity on the model is carried out. Impact of unit cost on the adoption of battery storage for PV under FiT is studied.
No takes yet. Share an insight, caveat, or question.
Hassan et al. (2017) studied this question.
Synapse has enriched one closely related paper. Consider it for comparative context: