Answers are grounded in this paper and cite their sources.
A watching brief observed test pits for potential archaeological features in a distilling area, highlighting significant heritage value.
A watching brief of the GI works took place on 5th July 2023, in largely sunny but humid conditions. 12 test pits were excavated. Each of the GI pits were excavated to the subsoil under archaeological supervision and recorded by photographic record and their location recorded on a survey grade GPS unit. Test pits 1-3 are slightly outwith the red line boundary as the GI contractors used a handheld GPS to locate the pits which is generally a less accurate location device. A further 7 test pits were watched after changes were made to the development sign on the 12th September 2023. These were also excavated to the subsoil under archaeological supervision and recorded by photographic record and their locations were recorded on a survey grade GPS unit. The DBA shows that there is both post-medieval and prehistoric activity within the surrounding area, with scheduled monuments both to the east and west of the study area. Of particular note for this project both due to its proposed location and its purpose is the long history of distilling both nearby and within the wider vicinity as demonstrated both in the historical records and by a small scale excavation and survey undertaken by NoSAS. All these give the area a high heritage potential. The only noteworthy feature uncovered during the GI works on the 5th July 2023, was the edge of a stone field drain which is likely to be of post-medieval date and not considered archaeologically significant. No archaeological features were uncovered during the GI works on the 12th September 2023. It should be noted however that this is a very small sample of the development area and these results do not necessarily represent an absence of archaeological feature across the site. Therefore, any future ground breaking in the area should still be subject to archaeological supervision and an evaluation should be undertake across the development area before large scale work begins.
No takes yet. Share an insight, caveat, or question.
Karen Kennedy (2023) studied this question.
Synapse has enriched 8 closely related papers on similar clinical questions. Consider them for comparative context: