Develops a framework to enhance preventive maintenance timing in expressway pavements, indicating cost effectiveness.
The preventive maintenance (PM) of asphalt pavements reduces life-cycle costs and minimizes resource consumption compared with reactive rehabilitation, yet its cost-effectiveness is highly sensitive to application timing. This study develops a data-driven framework for determining optimal PM timing on Korean expressways by integrating network-level pavement management system (PMS) deterioration modeling with life-cycle cost analysis (LCCA). Using 10-year PMS time-series data from approximately 2200 asphalt pavement sections (2012–2021), a nonlinear regression of the Highway Pavement Condition Index (HPCI) yielded an exponential deterioration model with exponent β = 1.87 (R2 = 0.996), confirming accelerating deterioration beyond a critical service age. The HPCI inflection coincides with the Grade-2 boundary (3.5–4.0), where surface distress growth—dominated by linear cracking (91.3% of total SD)—also peaks. A LCCA across 44 scenarios demonstrated that PM applied immediately before this acceleration onset minimizes the 40-year net present value (NPV; discount rate 4.5%). The optimal first PM application time was estimated at 10.8 years (≈56% of the 19.3-year average service life), reducing the 40-year NPV by up to 7 million KRW per section relative to the milling and overlay baseline (up to 16 million KRW in absolute NPV terms for concrete overlay sections). These findings provide a quantitative, reproducible basis for PM timing decisions applicable to the approximately 4000 km of expressway pavement managed by Korea Expressway Corporation.
No takes yet. Share an insight, caveat, or question.
Kim et al. (2026) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: