Novel algorithms improve scheduling efficiency in connected graphs under resource constraints, suggesting benefits for optimization.
We propose a novel scheduling problem with connectivity constraints. This problem defines a connected graph [Formula: see text], where each edge [Formula: see text] is associated with a processing time [Formula: see text] and cost [Formula: see text], i.e., [Formula: see text], where [Formula: see text] is the set of real positive numbers. The objective is to select a path [Formula: see text] in [Formula: see text] to establish connectivity between two given vertices and further to schedule the corresponding edges on [Formula: see text] parallel machines for minimizing the sum of the makespan and the total cost. This problem is strongly NP-hard, combining elements of graph theory and parallel machine scheduling. In this paper, we focus on the uniform parallel machine environment, for which we develop approximation algorithms and provide worst-case analysis. Our results contribute to scheduling theory in combinatorial optimization and provide new insights into network restoration under resource constraints.
No takes yet. Share an insight, caveat, or question.
Xu et al. (2026) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: