Answers are grounded in this paper and cite their sources.
Algorithm improves scheduling efficiency in manufacturing, indicating robust modeling for complex processes.
In recent years, with the advancement of production technology in the manufacturing industry, the scheduling problems that rely on modeling in real-world scenarios have gradually evolved into complex process flows. Aiming at the limited problem modeling capabilities of existing scheduling problems, this study proposes Multi-Stage Flexible Job Shop Scheduling Problem (MS-FJSP). MS-FJSP alters the fixed operation processing sequence of jobs in conventional scheduling problems and introduces staged processing to incorporate flexible constraints on operation selection. Furthermore, MS-FJSP modifies the constraint of unique machine compatibility, enabling arbitrary adjustments to machine combinations according to processing requirements. To address the complex flexibility and large-scale solution space of MS-FJSP, we propose a particle swarm optimization algorithm based on double neighborhood tabu search (TS-PSO). Specifically, the PSO algorithm determines a superior neighborhood structure for this problem, while the TS algorithm improves and optimizes the solution quality within the neighborhood of this solution structure. We verify the algorithm’s performance using a dataset consisting of 12,000 MS-FJSP instances and an MS-FJSP instance modeled from a real-world scheduling scenario. Experimental results demonstrate that TS-PSO can achieve excellent solution quality within a reasonable time, and MS-FJSP possesses efficient modeling capability for real-world scheduling scenarios.
No takes yet. Share an insight, caveat, or question.
Jiang et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: