This analysis investigates the response of transmission tower-line systems to complex seismic actions, suggesting improvements for seismic design codes.
Transmission tower-line systems spanning active faults are simultaneously subjected to the “dual characteristic seismic actions” of permanent ground displacement (PGD) and spatially varying near-fault ground motions, rendering their failure mechanisms far more complex than those under conventional site-specific seismic actions. This paper investigates a 500 kV double-circuit “two-tower, three-line” coupled system by establishing a high-fidelity finite element model. An analytical framework is proposed, centered on indexing seismic action and structural response by key parameters: “Permanent Ground Displacement–Peak Differential Displacement–Velocity Pulse Period” (“PGD–Δmax–Tp”). By employing synthesized ground motions, the displacement time history is decomposed into three components—a velocity pulse, high-frequency background noise, and permanent displacement—thereby achieving a strict decoupling of these three control variables. Based on this methodology, three sets of controlled-variable scenarios were constructed to systematically reveal the independent influence of ground motion spectral characteristics, permanent displacement, and peak differential displacement on the system’s response. The research indicates that: spectral characteristics modulate the failure mode (the whiplash effect is triggered when the period ratio μ is approximately 1–2, whereas tower leg buckling occurs when μ ≫ 1); a threshold PGD value exists that triggers a shift in the structural force-resisting mechanism; and the peak differential displacement (Δmax) causes the system’s response to transition from being dominated by conductor slackening and unloading to being governed by inertia and P-Δ effects. The insights gained into the asymmetric response characteristics of towers on opposite sides of the fault provide a quantitative reference for the revision of seismic design codes for cross-fault power transmission projects.
No takes yet. Share an insight, caveat, or question.
Wang et al. (2026) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: