Evaluates logistics and weather impacts on offshore wind turbine installation, suggesting optimization strategies.
Floating offshore wind projects face complex logistical and supply chain challenges, with floating substructures and associated turbine installation operations accounting for a substantial share of project CAPEX, making supply-chain and logistical management a critical concern in project planning. Delays and cost overruns often arise from resource limitations, site accessibility, port infrastructure, and weather conditions. This study develops a holistic discrete-event simulation (DES) framework using SimPy that integrates onshore and offshore operations, storage management, resource capacity constraints, and weather-sensitive installation tasks, enabling a system-level assessment of operational interactions and bottlenecks. The framework is applied to a realistic 1 GW floating wind farm off the west coast of Ireland, employing semi-submersible platforms with Moneypoint Port as the base port. Results show that offshore weather is the dominant source of project delays, while increasing installation vessels and wet-storage capacity can significantly reduce the production and project times, though trade-offs with vessel utilization remain. The framework provides a practical decision-support tool for evaluating system-level logistics, resource allocation, and weather impacts, complementing traditional engineering-focused analyses by offering insights into the coupled interactions between port operations, fabrication, and offshore installation, and supporting project planning, risk assessment, and operational optimization in floating offshore wind projects. • Integrated discrete-event simulation links onshore production, port logistics, and offshore installation. • Offshore weather is the main driver of delays in floating offshore wind projects. • Wet-storage capacity and vessel availability are key operational bottlenecks. • Design-of-experiments shows trade-offs between vessels, storage, and project timing. • Framework offers a decision-support tool to optimize floating offshore wind supply chains.
No takes yet. Share an insight, caveat, or question.
Sarichloo et al. (2026) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: