• RWGF integrates wake-aware spatial priors with multi-step interval forecasting. • The dynamic wake graph is designed as a forecasting-oriented spatial prior. • Soft directional attenuation and wake superposition reduce rigid graph assumptions. • Horizon-wise regularisation improves interval-boundary stability across lead times. • Step-wise conformal recalibration improves empirical coverage consistency. As power systems integrate increasing shares of renewable energy, ultra-short-term wind farm power forecasting is required to provide not only accurate point estimates but also calibrated uncertainty information for short-term forecasting applications. However, wind farm forecasting remains challenging because inter-turbine dependence varies with wind direction, wake interaction and local operating conditions, while multi-step prediction intervals may become miscalibrated under non-stationary operating regimes. This paper proposes RWGF, a reliable wind farm power forecasting framework with dynamic wake-aware spatio-temporal coupling, for multi-step point and interval forecasting. In RWGF, a directed dynamic wake graph is constructed from turbine layout, real-time wind conditions and a simplified wake velocity-deficit model. The graph is used as a computationally efficient spatial prior rather than as a high-fidelity flow-field reconstruction, and is coupled with a multi-scale TCN–GRU module to learn lagged temporal dependence and non-stationary power evolution. To generate ordered and stable prediction intervals, the shared spatio-temporal representation is further combined with non-crossing quantile learning, horizon-wise width and boundary-smoothness regularisation, and step-wise conformal recalibration. Experiments on SCADA data from two real-world wind farms show that RWGF improves deterministic forecasting accuracy and provides a more balanced coverage–sharpness trade-off than representative temporal, graph-based and Transformer-based baselines. Additional analyses under intense-turbulence and rapid-ramping conditions suggest that the proposed framework maintains more stable empirical performance under disturbed operating regimes. The results suggest that combining wake-aware dynamic spatial priors with horizon-wise interval calibration can improve empirical calibration quality under the tested SCADA forecasting settings.
No takes yet. Share an insight, caveat, or question.
Wang et al. (2026) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: