Answers are grounded in this paper and cite their sources.
This paper presents a new bi-objective model to deal with an integrated production planning and reliability-based multi-level preventive maintenance (PM) scheduling problem. The production system includes a set of parallel deteriorating machines. The model aims to find the production lot sizes and the sequence and interval of PM activities over a multi-shift planning horizon. The PM activities are classified as the adjustment and replacement ones, each of which has a specific cost and effect on machines. The model serves to minimise the total cost while maximising customer satisfaction. Also, the most profitable customers are identified by applying a hybrid multi-attribute decision making (MADM) approach (BWM-TOPSIS) in order to fulfil their orders in their desirable time windows. Three efficient meta-heuristic algorithms are developed to solve the proposed model for large-scale problems. Besides, TOPSIS method is employed to select the most desirable solution among the obtained Pareto solutions. Finally, a case study is provided to show the applicability of the proposed approach.
No takes yet. Share an insight, caveat, or question.
Gharoun et al. (2021) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: