Answers are grounded in this paper and cite their sources.
This paper presents a stochastic cost model and a solution technique for optimal scheduling of the generators in a wind integrated power system considering the demand and wind generation uncertainties. The proposed robust unit commitment solution methodology will help the power system operators in optimal day-ahead planning even with indeterminate information about the wind generation. A particle swarm optimization based scenario generation and reduction algorithm is used for modeling the uncertainties. The stochastic unit commitment problem is solved using a new parameter free self adaptive particle swarm optimization algorithm. The numerical results indicate the low risk involved in day-ahead power system planning when the stochastic model is used instead of the deterministic model.
No takes yet. Share an insight, caveat, or question.
Pappala et al. (2009) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: