Answers are grounded in this paper and cite their sources.
An item breaks down when it wears continuously beyond a certain threshold. The item is preventively replaced as the wear at periodic inspections exceeds a certain wear limit; on failure, it is replaced immediately. The optimal wear limit for preventive replacement that minimizes the long-run total average-cost rate is derived. A numerical example demonstrates its computability.< <ETX xmlns:mml="http://www.w3.org/1998/Math/MathML" xmlns:xlink="http://www.w3.org/1999/xlink">></ETX>
No takes yet. Share an insight, caveat, or question.
K.S. Park (1988) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: