Los puntos clave no están disponibles para este artículo en este momento.
In economic operation of electric power systems, reasonable schedules for generating equipments and for economic load dispatching should not be considered separately, but should be treated as parts of an integrated operation scheduling.
Hara et al. (Sun,) studied this question.