Answers are grounded in this paper and cite their sources.
In economic operation of electric power systems, reasonable schedules for generating equipments and for economic load dispatching should not be considered separately, but should be treated as parts of an integrated operation scheduling.
No takes yet. Share an insight, caveat, or question.
Hara et al. (1966) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: