Answers are grounded in this paper and cite their sources.
A geometric process delta -shock maintenance model for a repairable system is introduced. If there exists no shock, the successive operating time of the system after repair will form a geometric process. Assume that the shocks will arrive according to a Poisson process. When the interarrival time of two successive shocks is smaller than a specified threshold, the system fails, and the latter shock is called a deadly shock. The successive threshold values are monotone geometric. The system will fail at the end of its operating time, or the arrival of a deadly shock, whichever occurs first. The consecutive repair time after failure will constitute a geometric process. A replacement policy N is adopted by which the system will be replaced by a new, identical one at the time following the N th failure. Then, for the deteriorating system, and the improving system, an optimal policy N* for minimizing the long-run average cost per unit time is determined analytically.
No takes yet. Share an insight, caveat, or question.
Yeh Lam (2009) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: