Construction is an essential contributor for both developed and developing economies. Corruption, schedule delays, cost overruns, and erratic project performance are common few problems that face the conventional procurement process of any organization. This research focused on the weakness of current procurement practices in public construction projects in Iraq, as stated by the World Bank and Organization for Economic Cooperation and Development (OECD) reports. The methodology of this study was to collect data by conducting a thorough systematic search of existing literature. The authors used QDA Miner 4 software for coding and thematic categorization. The study found 42 variables from previous studies, and the authors distributed these variables into 12 thematic divisions representing the organization's key performance indicators (KPIs). The authors conclude that these indicators are important to introduce many frameworks for the integration of procurement process in developing countries. For future studies, there is a possibility to introduce an integrated construction and design framework to enhance organizational performance and the procurement process.
No takes yet. Share an insight, caveat, or question.
Alsamarraie et al. (2022) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: