The tritium required for ITER will be supplied from the CANDU production in Ontario, but while Ontario may be able to supply 8 kg for a DEMO fusion reactor in the mid-2050s, it will not be able to provide 10 kg at any realistic starting time. The tritium required to start DEMO will depend on advances in plasma fuelling efficiency, burnup fraction, and tritium processing technology. It is in theory possible to start up a fusion reactor with little or no tritium, but at an estimated cost of $2 billion per kilogram of tritium saved, it is not economically sensible.
No takes yet. Share an insight, caveat, or question.
Kovari et al. (2017) studied this question.
Synapse has enriched 4 closely related papers on similar clinical questions. Consider them for comparative context: