The ITER Magnet System

View Full Paper
NMN. MitchellDBD. BessetteRGR. Gallix

Key Points

Key points are not available for this paper at this time.

Abstract

Procurement of the ITER magnets is due to start at the end of 2007/early 2008, with the launch of the longest lead time items, the conductor and the TF coil windings. The base design for procurement was established in 2001, and the build up of the Cadarache ITER team has been accompanied by a review of the most critical, or controversial, features of the 2001 design. At the same time, an urgent R&D program has been launched to complete the necessary verification of the design solutions that are proposed. In this paper an overview will be presented of the main design features and drivers, and some of the recent issues and R&D results will be summarized.

Ask AI
Helpful
Bookmark
Share
View Full Paper

Cite This Study

Mitchell et al. (2008) studied this question.

synapsesocial.com/papers/6a10a34001be78fe8161262fhttps://doi.org/10.1109/tasc.2008.921232
Ask AI
Helpful
Bookmark
Share
View Full Paper

Also Consider

Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context:

  1. 1Quality control in the design, fabrication and operation of the ITER magnets2006 · 6 citations
  2. 2Review of the Results of the ITER Toroidal Field Conductor R&D and Qualification2008 · 45 citations
  3. 3Electrical Design Requirements on the ITER Coils2008 · 28 citations
  4. 4Review of Nb3Sn conductors for ITER2007 · 101 citations
  5. 5Final Assembly and Installation of the ITER TF Coils2008 · 19 citations