This paper presents a robust optimisation framework for long-term composite generation and transmission expansion planning problem which considers inherent uncertainties such as load growth, fuel cost and renewable energy output uncertainties. In this paper, a bi-level robust optimisation framework is proposed to accommodate wind output uncertainty in line with the uncertain demanded loads and uncertain fuel cost. The addressed optimisation problem is modelled as a mixed-integer optimisation framework with the objective of providing a robust expansion plan while maintaining the minimum cost expansion. In order to evaluate the robustness of each plan, an off-line Lattice Monte Carlo simulation technique is adopted in this study. The validity of the proposed method is examined on a simple six-bus and modified IEEE 118-bus test system as a large-scale case study. The simulation results show that the presented method is both satisfactory and consistent with expectation.
No takes yet. Share an insight, caveat, or question.
Mansouri et al. (2016) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: