Key points are not available for this paper at this time.
In this paper, the short-term load forecast by use of autoregressive moving average (ARMA) model including non-Gaussian process considerations is proposed. In the proposed method, the concept of cumulant and bispectrum are embedded into the ARMA model in order to facilitate Gaussian and non-Gaussian process. With embodiment of a Gaussianity verification procedure, the forecasted model is identified more appropriately. Therefore, the performance of ARMA model is better ensured, improving the load forecast accuracy significantly. The proposed method has been applied on a practical system and the results are compared with other published techniques.
Huang et al. (Thu,) studied this question.