Answers are grounded in this paper and cite their sources.
Estimating the annual production cost is a crucial component in long range capacity planning for electric utilities. Traditional simulation-based methods are quite expensive in terms of computer resources (space and time), while simpler mathematical programming-based models generally assume a linear variable production cost. This paper presents a method that incorporates quadratic production costs for each unit and uses optimization submodels to develop a system production cost versus output curve. The method is tested using data from a large southeastern utility. Production cost estimates within one percent of the estimates from a large simulation model were obtained with a small fraction of the simulation model's computing time. The concluding section discusses how the new method might be incorporated in procedures for capacity planning.
No takes yet. Share an insight, caveat, or question.
Ammons et al. (1983) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: