Study addresses surrounding rock control in non-pillar mining, suggesting effective techniques for stability.
Under green mine construction and efficient resource utilization, non-pillar mining has been increasingly applied. However, surrounding rock control remains difficult in traditional gob-side entry retaining under large mining height conditions. To address this problem, a cooperative control method combining roof cutting and pressure relief with a pre-placed backfill strip for coal pillar replacement is proposed. Taking the 15,108 and 15,110 working faces of Wangzhuang Coal Industry as the engineering background, a mechanical model and FLAC3D simulations were used to analyze the effects of roof cutting height and backfill strip width. The results show that roof cutting shortens the goaf-side suspended roof, weakens lateral abutment pressure, and improves the stress state of the strip. When the roof cutting height increases from 11 m to 13 m, the peak vertical stress of the strip decreases from 16.2 MPa to 13.9 MPa, with a reduction of 14.2%. When the strip width increases from 1.0 m to 1.5 m, the peak stress decreases by about 12.0%. Thus, the reasonable roof cutting height and strip width are determined to be 13 m and 1.5 m. Field monitoring shows maximum roof-to-floor and rib-to-rib convergences of 178.5 mm and 143.5 mm, respectively, with no obvious strip instability.
No takes yet. Share an insight, caveat, or question.
Ji et al. (2026) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: