Answers are grounded in this paper and cite their sources.
The Holt, Modigliani, Muth, and Simon production scheduling model is extended to incorporate variables reflecting marketing and working capital management in a cash flow formulation. A constrained nonlinear program is dervied for which a local optimal solution is discovered employing the SUMT program. Reasonable values are are assigned to the parameters and the relative profitability of such a simultaneous formulation, compared to a sequential model, is tested. Initial results demonstrate an improvement of 25% by solving for the optimal values of the functional decision variables simultaneously.
No takes yet. Share an insight, caveat, or question.
Damon et al. (1972) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: