Answers are grounded in this paper and cite their sources.
A graphical method is proposed to display a number of point estimates while allowing for their differing standard errors. More generally, it can be viewed as a representation of interval estimates by points on a bivariate plot. The method exploits a familiar connection between standardized estimates and regression through the origin and has several advantages over some alternative plots used in the literature. It is particularly useful when there may be a mixture of parameters, as illustrated by the problem of “mixed ages” in fission track dating.
No takes yet. Share an insight, caveat, or question.
R. F. Galbraith (1988) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: