Answers are grounded in this paper and cite their sources.
In this paper we consider a problem of job scheduling on parallel machines with a presence of incompatibilities between jobs. The incompatibility relation can be modeled as a complete multipartite graph in which each edge denotes a pair of jobs that cannot be scheduled on the same machine. We provide several results concerning schedules, optimal or approximate with respect to the two most popular criteria of optimality: Cmax (makespan) and ∑Cj (total completion time). We consider a variety of machine types in our paper: identical, uniform, and unrelated. Our results consist of delimitation of the easy (polynomial) and NP-hard problems within these constraints. We also provide algorithms, either polynomial exact algorithms for the easier problems, or algorithms with a guaranteed constant worst-case approximation ratio. In particular, we fill the gap on research for the problem of finding a schedule with the smallest ∑Cj on uniform machines. We address this problem by developing a linear programming relaxation technique with an appropriate rounding, which to our knowledge is a novelty for this criterion in the considered setting.
No takes yet. Share an insight, caveat, or question.
Pikies et al. (2021) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: