Answers are grounded in this paper and cite their sources.
Analyzes wave energy converter park optimization in Mexico, indicating the importance of bathymetry costs.
Todos Santos Bay, Mexico, features several wave-focusing areas driven by its complex bathymetry, making it an ideal real-world test case for wave energy converter (WEC) park optimization. This study quantifies the influence of submarine cable costs and bathymetry-dependent mooring costs on the proposed park layout (hereafter the star-layout) and the levelized cost of energy (LCOE) of a 10-device WEC park, using a multi-state operational wave climatology of N=179 representative sea states from a 2008–2018 SNL-SWAN hindcast (covering 97.20% of the annual time). A binary genetic algorithm combined with K-means clustering analysis was used to minimize LCOE under three cost scenarios: baseline, cable-only, and cable plus bathymetry-dependent mooring. Both infrastructure cost components contribute substantially: cable costs add 52.2% to the baseline LCOE, and bathymetry-dependent mooring costs add a further 16.0% at this site, with cable approximately three times more impactful. These quantitative magnitudes are conditioned on the moderate depth-gradient setting of Todos Santos Bay; the qualitative cost-component hierarchy is expected to generalize, but the relative weights will depend on the bathymetric and wave-climate characteristics of each candidate site. The mooring contribution is nontrivial both economically and spatially (the centroid of the park shifts by approximately 151 m between the cable-only and cable-plus-depth scenarios). K-means clustering identified 2–4 layout families per scenario (K =4→3→2 as cost components are added), indicating that infrastructure constraints reduce the viable solution space. These results support the central hypothesis of this work: WEC park optimization studies that adopt flat-bathymetry simplifications, the prevailing assumption in much of the prior literature, risk substantial underestimation of LCOE at sites with nontrivial depth variation. We recommend that bathymetry-dependent mooring costs be included alongside cable costs in any early-stage techno-economic assessment of WEC parks at sites with complex bathymetry.
No takes yet. Share an insight, caveat, or question.
Santiago-Ojeda et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: