Answers are grounded in this paper and cite their sources.
Firms heavily emphasise reducing carbon footprint, an area warranting further improvement. This study examines carbon footprint within the context of production scheduling. Two multi-objective scheduling problems involving economic- and environmental-related criteria are studied: (1) a batch-processing machine scheduling problem to minimise the total weighted tardiness and carbon footprint simultaneously; (2) a triple-criteria scheduling problem involving of a hybrid flow shop consisting of a batch-processing machine followed by two parallel-processing machines, in which the shop attempts to minimise the total weighted tardiness, carbon footprint and peak power. Since the above problems are treated as a true multi-objective optimisation problem, decision-makers should select a solution among the trade-off solutions provided in the Pareto-optimal set. Therefore, the non-dominated sorting-based genetic algorithm II (NSGA-II) is implemented, which identifies the set of approximate efficient schedules to both multi-objective scheduling problems. Moreover, an adaptive multi-objective genetic algorithm (AMGA) is developed to generate the reference Pareto front, which validates the results that are obtained using NSGA-II. Results of this study demonstrate both the effectiveness of AMGA in converging to the true Pareto-optimal set and the efficiency of NSGA-II.
No takes yet. Share an insight, caveat, or question.
Liu et al. (2013) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: