Answers are grounded in this paper and cite their sources.
An integrated work shift scheduling system is developed and applied in the scheduling of 2600 telephone operators in 43 locations of the General Telephone Company of California. The system involves the forecasting of calls on a half‐hourly basis, the conversion to operator requirements, the scheduling of tours by a heuristic algorithm, the assignment of operators to tours, and the operation of the system.
No takes yet. Share an insight, caveat, or question.
Buffa et al. (1976) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: