Answers are grounded in this paper and cite their sources.
In this article, we examine a Networked Control System (NCS) in which the plant and the controller communicate over a network subject to a certain communication constraint. The plant is described by discrete-time nonlinear dynamics subject to bounded disturbances . Due to an overloaded communication network, we assume that the control signal and the information from the plant (the measured output signal) cannot be transmitted simultaneously and are subject to a multiplexing constraint. The goal is to design a switching strategy that allows us to sequentially communicate given these constraints while optimizing a quadratic cost over a finite horizon. Consequently, we proceed by emulation and assume that a controller that satisfies performance requirements is already provided. The resulting optimization problem is observed to be an integer programming problem that is generally NP-complete, i.e., the complexity is exponential in the time horizon considered. To overcome this issue, we provide a different perspective on this problem than what has been presented by the community before. Our main contribution is to reformulate the problem with all its constraints to a form that renders it amenable to apply the discrete-time Pontryagin Maximum Principle to get the necessary conditions for the optimality of the control action sequence. These necessary conditions are then solved numerically by a multiple-shooting method. To validate the approach, we present some illustrative numerical experiments on an inverted pendulum . Different setups are considered and numerically analyzed: usage of a predictor when the output is not transmitted and usage of the previous value of the output when the new value is not transmitted, with or without the choice of non-transmission.
No takes yet. Share an insight, caveat, or question.
Oza et al. (2024) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: