Answers are grounded in this paper and cite their sources.
Earthwork adjustment plays an important role in the construction of the whole project and the impact on the environment. It is important to formulate earthwork allocation scheme on the basis of accurate earthwork calculation. We use professional equipment to collect the electronic initial topographic map, and then use it to calculate the design elevation to generate the electronic design topographic map. The earthwork volume and centre of gravity, the unit transportation cost, and the earthwork allocation scheme with the minimum transportation cost can be finally calculated. This paper presents a model to establish the optimal allocation model of road engineering earthwork based on BIM Technology, and a case is used to verify the model is economical, scientific and reasonable.
No takes yet. Share an insight, caveat, or question.
Lingfeng Yu (2022) studied this question.
Synapse has enriched 7 closely related papers on similar clinical questions. Consider them for comparative context: