Answers are grounded in this paper and cite their sources.
The potential for disputes among contracting parties in public–private partnership (P3) projects is significant, making effective dispute resolution mechanisms crucial. These mechanisms are integral to risk assessment and contract negotiations, particularly because maintaining strong working relationships throughout the project is more critical than in traditional contracts. Although prior studies examined dispute review board (DRB) mechanisms in P3 projects, there is still a lack of data on major disputes occurring at various interface levels and across different DRB arrangements. This study aimed to investigate the major disputes that arose at different interface levels of P3 projects and identify effective DRB arrangements suitable for various types of disputes. The methodology included a literature review as well as 10 P3 projects’ contract documents content analysis, establishing a benchmark for current dispute resolution methods. These were infrastructure projects located in North America. Following this, three focus groups were conducted, each with four to six participants—comprising all DRB members, all project team members, or a mix—to discuss existing effective practices and proposed DRB models. The pros and cons of each of the DRB models were underscored through the focus groups; the DRB process arrangement was seen to also depend on nine factors. These factors can be further employed to develop a framework or toolkit to identify the most appropriate model for a P3 project in its initial planning stage.
No takes yet. Share an insight, caveat, or question.
Jaganathan et al. (2025) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: