Answers are grounded in this paper and cite their sources.
This article presents the design procedures and average run lengths for two mulativariater cumulative sum (CUSUM) quality-control procedures. The first CUSUM procedure reduces each multivariate observation to a scalar and then forms a CUSUM of the scalars. The second CUSUM procedure forms a CUSUM vector directly from the observations. These two procedures are compared with each other and with the multivariate Shewhart chart. Other multivariate quality-control procedures are mentioned. Robustness, the fast initial response feature for CUSUM schemes, and combined Shewhart-CUSUM schemes are discussed.
No takes yet. Share an insight, caveat, or question.
Ronald B. Crosier (1988) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: