Prognostics and health management (PHM) is a discipline of techniques utilizing in situ monitoring and analysis to assess and trend system degradation and to determine remaining useful life with a defined level of confidence for a specified coverage of anticipated events. One of the techniques for PHM is the use of a canary: an early-warning device derived from the use of a canary bird to detect the presence of poisonous gases in a mineshaft. This paper proposes a cost-based decision model to evaluate the economic benefit of the use of canary devices and the optimal replacement time of a canary-equipped system if the canary issues a warning. This paper also discusses the influence of scheduled preventive maintenance on the replacement policy of a canary-equipped system. The model is demonstrated with an example from the aviation industry.
No takes yet. Share an insight, caveat, or question.
Wang et al. (2010) studied this question.
Synapse has enriched one closely related paper. Consider it for comparative context: