Answers are grounded in this paper and cite their sources.
A production run is typically referred to as a group of identical goods that is produced by a particular manufacturing process. In many discrete manufacturing practices, the manufacturing activity is carried out by deploying a series of production runs of different products according to customer orders. If the volume of a production run is relatively small and process changeovers are necessary, the production system operates partially (or entirely) in the transient regime, especially at the beginning and near the end of a production run. In this case, the traditional steady-state analysis approach may become inapplicable. In this paper, we consider finite production run-based manufacturing in serial lines with machines obeying the geometric reliability model and buffers having finite capacity. Exact Markovian analysis is first used to derive the closed-form formulae to calculate the transient performance of the production line during a production run as well as the distribution, mean, and standard deviation of its completion time in one- and two-machine lines. For multi-machine lines, an aggregation-based approach is proposed to approximate the system performance measures with high accuracy and computational efficiency. In addition, system-theoretic properties of production run completion time with respect to machine and buffer parameters are discussed.
No takes yet. Share an insight, caveat, or question.
Jia et al. (2018) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: